Print Page   |   Contact Us   |   Report Abuse   |   Sign In   |   Join the DCA
DCA Member Search
Event Calendar

07/06/2017 » 28/12/2017
Training & Education Courses in 2017

18/10/2017
Westminster Forum - Employment Forum

07/11/2017 » 08/11/2017
Zettastructure

07/11/2017
Westminster Forum - Energy

15/11/2017 » 16/11/2017
Data Centre World Paris 2017

Top Contributors

DCA Member's Blog
Blog Home All Blogs
Please post data centre industry comments, experiences, ideas, questions, queries and goings-on here - to stay informed with updates, ensure you are subscribed by clicking the "subscribe" button.

 

Search all posts for:   

 

Top tags: Date Centre  Datacentre  efficiency  EMKA UK  central  Cooling  data  data centre  London  cloud  data centre security  Location  pue  swinghandles  connectivity  EMKA  energy-efficient computing  LDeX Group  air management  anti contamination  BioLock  data centre cleaning  data centre security;  disaster recovery  EU CODE of Conduct  infrastructure  planning  power  university of east london  building 

“Why every datacentre needs a permanently installed resistive LOADBANK”

Posted By Paul Smethurst, Hillstone Products, 03 February 2017

Press release for immediate issue

 

3rd Feb 2017

 

“Why every datacentre needs a permanently installed resistive LOADBANK”

 

UK LOADBANK manufacturer, Hillstone Products, have developed a load bank solution to increase reliability, efficiency, and uptime performance whilst reducing energy costs when operating a datacentre.

 

The loadbank_GENSET range has been designed to overcome fuel being the single point of failure in a datacentre and to prevent breaches in generators Service Level Agreement ( SLA ) & warranty conditions by maintaining best practice expected in mission critical datacentre infrastructure.

 

The release of the loadbank_GENSET range co-in sides with 6 months’ extensive research, by Hillstone’s MD Paul Smethurst, which has looked at the consequences of supporting low IT load with generator backup systems that are dimensioned against maximum operating scenarios.

 

Smethurst states “The benefits of having a permanent load bank connected to the genset system include:

-       validation of Fuel Supplies,

-       prevention of Wet Stacking

-       associated operating savings in energy costs

to creates a very short ROI by improvements of best practice and ensuring uptime performance.”

 

The loadbank_GENSET range is designed using the latest PLC technology to deliver a dual automatic & manual operation with open software interfacing to BMS & DCIM systems.

 

The loadbank_GENSET range moves the load bank industry away from expensive propriety control systems.

 

More information is available either online at www.loadbanks.co.uk or via our UK sales office:  

Tel +44(0) 161 763 3100  sales@hillstone.co.uk

 

Hillstone will also be exhibiting at DCW17, ExCel, London 14th & 15th March 2017 on Stand L80 and are also the LOADBANK sponsor for the Live Green Datacentre

 

Paul Smethurst is an Incorporated Engineer & Fellow of The Institute of Engineering Technology and Industry Mentor to the Mechanical Faculty at The University of Leeds.

Hillstone Products are members of DCA & EU Code of Conduct for datacentres

 

 

END

 Attached Thumbnails:

Tags:  Generator  loadbanks 

Share |
PermalinkComments (0)
 
Sign In
Sign In securely
News

Data Centre Alliance

Privacy Policy